HomeNewsPhotos

Photos

Splash into summer
The Tyndall Air Force Base pool is scheduled to re-open May 27, 2017 for the approaching summer season. Maintenance must be done prior to opening, to include draining the pool, painting, pressure washing, and servicing the locker rooms. (U.S. Air Force photo by Airman 1st Class Isaiah J. Soliz/Released)

Download Image: Full Size (1.04 MB)
Tags:
Photo by: Airman 1st Class Isaiah J. Soliz |  VIRIN: 170223-F-XK019-2002.JPG