News Search

  • Resilience in keeping the mission alive

    Airman 1st Class Philip James' resiliency was tested when experiencing an injury causing him to be taken from the work he loves and put into a support role. This would mark James' journey with personal struggle and perseverance in overcoming obstacles that shaped him into the dedicated and

  • Connecting Tyndall’s Airmen and Families

    Tyndall Connects brings together a mix of clubs, organizations and groups from on base and the surrounding area where military members and civilians can come together to build relationships, share experiences and support one another, all aiming to cultivate a stronger and more united community.

  • Sea turtles set strides at end of nesting season

    The 325th Fighter Wing reported a record-breaking sea turtle nesting season at the beaches located on Tyndall Air Force Base.Nesting season kicks off annually on May 1 and proceeds through Aug. 31. This season in particular has been nothing short of monumental.

  • 82nd ATRS facilities near completion

    With construction nearing completion, the 82nd Aerial Target Squadron prepares to take ownership of their new large and small boat facilities. The facilities sustained significant damage following the impact of Hurricane Michael in 2018 and are a part of the Department of Defense’s largest rebuild

  • Long awaited F-35 aircraft touch down at Tyndall

    As the Air Force continues to evolve by modernizing its capabilities and maintaining air superiority in an ever-changing global security landscape, Tyndall Air Force Base, Florida has officially transitioned from an air dominance training mission to a fully combat capable F-35A Lightning II fighter

  • Checkered Flag 23-1 Concludes

    Tyndall Air Force Base wrapped-up Checkered Flag 23-1 exercise today, after two weeks of rigorous flying operations.

  • Tyndall breaks ground on flight line facilities for F-35A mission

    A groundbreaking ceremony for the single largest military construction contract on record in the Air Force database was held here, Sept. 13, 2022, as Tyndall began construction on flight line facilities to directly support the F-35A Lightning II aircraft and personnel that will call the base home

  • Tyndall ROCs and rolls with future flight line construction rehearsal

    With the largest rebuild in Air Force history well underway, the 325th Fighter Wing along with the Air Force Civil Engineer Center, U.S. Army Corps of Engineers and Air Force Installation and Mission Support Center are taking all necessary steps to ensure the nearly $5 billion project goes according

  • 325th Maintenance Squadron armament; making fighter jets lethal

    The 325th Maintenance Squadron armament flight supports the 325th Fighter Wing’s mission of training and projecting unrivaled combat power no matter the struggles they may face. The armament flight at Tyndall Air Force Base is responsible for ensuring weapons systems are operationally ready by